F10 CDM Notification Calculator - Construction Project Compliance Tool

SafetyRAC’s F10 notification calculator helps to identify whether a construction project is notifiable under the CDM Regulations 2015. Our easy to use tool allows clients, contractors and other duty holders to identify whether their project meets the criteria for formal notification to the Health and Safety Executive (HSE), ensuring compliance with legal requirements for health and safety management on construction sites.

F10 notification

CDM Regulations 2015 - F10 Notification Tool Guidance

Important Note: While a project may not meet the criteria for F10 notification, it is important to understand that all other requirements of the CDM Regulations 2015 still apply. Duty holders must ensure that health and safety arrangements are properly planned, managed, and monitored throughout the construction project. This includes appointing competent duty holders, preparing necessary documentation such as construction phase plans, and ensuring effective communication and cooperation among all parties involved. 

HSE F10 Notification Calculator

Use this tool to check if your construction project is notifiable to the HSE under the CDM Regulations 2015.

What is an F10 Notification?

An F10 notification is a legal requirement under the Construction (Design and Management) Regulations 2015 for notifiable construction projects. It notifies the Health and Safety Executive (HSE) of specific projects which typically pose a higher level of risk. The information required within the F10 includes the project duration, nature of the work, and key duty holders.

A construction project is notifiable if the construction work is expected to last longer than 30 working days and have more than 20 workers working at the same time (at any point on the project). Alternatively, it is notifiable if the work is expected to exceed 500 person-days.

Demolition work often requires notification to the HSE regardless of the project duration or number of workers involved. If you are undertaking demolition, be prepared to submit an F10 notification.